Quick answer
Quick answer: back up the original, pick the right format/settings, run a small batch, spot-check the output. Removal/disposal/renovation may need permits.
Why it matters
Get the shortest path working before optimizing.
Removal.
Step by step
- Test/assess/confirm lead location/condition.
- Separate encapsulation/removal/replacement/soil/cleaning.
- Use certified/compliant contractors.
- Contract states scope/protection/cleanup/clearance.
Common mistakes
- Sanding/demolition without testing.
- Hiring uncertified low-cost crews.
- Ignoring dust/soil/windows.
- No protection/clearance terms.
Checklist
- Testing/location/condition/area.
- Encapsulation/removal/replacement/soil/cleaning.
- Certification/protection/permits/clearance.
- Contract/payment/warranty.
- Health/relocation/budget.
Key facts
- Removal.
- Disposal.
- Renovation.
FAQ
What is the quick answer for Permits?
Quick answer: back up the original, pick the right format/settings, run a small batch, spot-check the output. Removal/disposal/renovation may need permits.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: HUD